Post-Quantum Readiness: A 60-Day Cryptography Inventory and Vendor Questionnaire

This 60-day guide turns the August 2024 NIST post-quantum standards milestone into an achievable discovery programme. It provides a work sequence, evidence fields, a supplier questionnaire and go/no-go criteria without claiming that every platform is ready to migrate

INSIGHTS / Guide overview

Guide overview

Five-step practical exercise: Choose a sponsor from technology leadership and a service owner for every in-scope platform. Start with five critical journeys, such as remote access, client portal, finance integration, software signing and supplier file exchange. Capture their business impact and confidentiality requirements. Agree that this is a discovery project, not a promise to replace every algorithm in 60 days. Write down the evidence standard. A screenshot of a certificate configuration, vendor support statement and aut

Technology leaders, infrastructure architects, security managers and procurement owners

INSIGHTS / What you will learn

What you will learn

  1. Establish scope and accountable owners (days 1–10)
  2. Inventory and dependency mapping (days 11–25)
  3. Supplier questionnaire (days 26–40)
  4. Prioritise and test (days 41–52)
  5. Final decision pack (days 53–60)
INSIGHTS / The guide

The guide

Chapter 1 — Establish scope and accountable owners (days 1–10)

Choose a sponsor from technology leadership and a service owner for every in-scope platform. Start with five critical journeys, such as remote access, client portal, finance integration, software signing and supplier file exchange. Capture their business impact and confidentiality requirements. Agree that this is a discovery project, not a promise to replace every algorithm in 60 days.

Write down the evidence standard. A screenshot of a certificate configuration, vendor support statement and automated discovery finding should be traceable to a system and date. Record unresolved questions separately; they will determine where technical testing is needed.

Define acceptance for this stage before a supplier or implementation team shows its preferred outcome. A passing example produces contract clause, control evidence date, test export and exception approval, demonstrates the correct access or approval boundary and allows a second reviewer to reproduce the observation. A failing example leaves the cause of contract lock-in and unclear data processing commitments unresolved or relies on an undocumented administrator privilege. Record “pass”, “conditional” or “fail” with a reason and a retest owner; a conditional pass must have an expiry date. For compliance & governance, also record the operational indicator unresolved material supplier exceptions at renewal, because a technically correct configuration may still create unacceptable user effort. For the chapter 1 — establish scope and accountable owners (days 1–10) step, check support ownership when the workflow crosses a team boundary. Name the team that owns the alert, the person who can stop processing and the procedure for returning to approved manual work. Test the handover during a staff change so that an undocumented verbal explanation cannot hide missing information. Record the first responder, the escalation decision and the business effect before closing the issue.

Putting the current workflow into practice

At the the current workflow stage, begin with a controlled staff request moving between two teams. Map the original trigger, the person who may approve the action and the system that holds the authoritative result. For post-quantum cryptography transition, the relevant information is algorithm inventory, certificate chain, vendor dependency and test result. A scope that cannot name these elements will usually struggle to identify ownership when something goes wrong.

A practical operating decision begins with an application using long-lived certificates and a third-party cryptographic library. Keep the operating instructions usable during an out-of-hours incident, including the contact who can stop a risky integration and the permitted manual alternative. Review repeated service failures for a common dependency or unclear ownership. Changes should produce a better diagnostic or decision path, not just another generic checklist. Where the outcome affects authorised data use, correct approvals and a reliable business outcome, the process owner and business reviewer should confirm that the user’s task can safely resume. The outcome for the chapter 1 — establish scope and accountable owners (days 1–10) stage is a dated record of the accepted business state and any remaining exception.

Chapter 2 — Inventory and dependency mapping (days 11–25)

Survey public-facing services, internal PKI, VPNs, email, backups, databases and embedded systems. Log service name, owner, certificate or key mechanism, algorithms when observable, data class, vendor, expiry and anticipated retirement. Map inbound clients as well as servers. A protocol upgrade that disconnects a scanner, industry application or branch router may be a serious operational issue.

Group unknowns by supplier and service impact. Use configuration evidence where possible and label all inferred information as such. An incomplete but honest inventory is more useful than a falsely complete one.

Technology Plus can assist with Essential Eight & Compliance when this work moves from planning into implementation.

Related reading: Incident Readiness and AI Connector Controls: A 60-Day Assurance Checklist · Cloud Data Warehouse Access Review and Incident Readiness Checklist

Define acceptance for this stage before a supplier or implementation team shows its preferred outcome. A passing example produces contract clause, control evidence date, test export and exception approval, demonstrates the correct access or approval boundary and allows a second reviewer to reproduce the observation. A failing example leaves the cause of contract lock-in and unclear data processing commitments unresolved or relies on an undocumented administrator privilege. Record “pass”, “conditional” or “fail” with a reason and a retest owner; a conditional pass must have an expiry date. For compliance & governance, also record the operational indicator unresolved material supplier exceptions at renewal, because a technically correct configuration may still create unacceptable user effort. For the chapter 2 — inventory and dependency mapping (days 11–25) step, reproduce a negative-path case before expanding access. Give the reviewer a normal request and a second request that should be rejected. Record the access reason, the specific failed condition and the operator who can correct it. If the team cannot reproduce that denial, hold deployment and retain the existing manual control until it can.

Putting target outcomes and dependencies into practice

The central decision in target outcomes and dependencies is who may access PKI, network protocols and application libraries and for what purpose. A common failure is that a hidden dependency could prevent migration to newer key exchange or signing schemes. The access design should separate ordinary staff, project operators, suppliers and automated accounts. Time-bound privileged rights must have a named sponsor and a revocation method that can be tested independently.

An approval record is stronger when it contains a failed as well as a successful test. Test a normal request and then replace a test certificate and confirm affected clients can complete an approved connection. Classify the result as accepted, safely refused, incomplete or incorrectly accepted, rather than reporting a single success percentage. Keep algorithm inventory, certificate chain, vendor dependency and test result with the result. Record what the operator expected, what actually happened, who reviewed the difference and which correction followed. The record should be understandable to the security architect, PKI owner and application maintainer, who can agree a pass, a revision or a pause based on observed outcomes. The outcome for the chapter 2 — inventory and dependency mapping (days 11–25) stage is a dated record of the accepted business state and any remaining exception.

Chapter 3 — Supplier questionnaire (days 26–40)

Send a consistent set of questions: Which post-quantum standard is supported, if any? Is the feature released, in preview or planned? Which versions and regions are covered? Which client libraries, firmware and certificate authorities need changing? What interoperability tests exist? Who owns the keys? What monitoring and rollback do you provide? What contract or licence change is required?

Request written answers with dates. Put unsupported or unconfirmed dependencies into the risk register rather than accepting broad “quantum-safe” labels.

Putting permissions and integration design into practice

During permissions and integration design, put a normal request and an adverse request through the same version of the solution. A representative example is to replace a test certificate and confirm affected clients can complete an approved connection. Record the expected state of the underlying business record before the test and the actual state afterwards. A success message is insufficient if the record is incorrect, inaccessible or duplicated.

Assess vendor claims using the same controlled business case for every option. Separate non-negotiable controls from weighted preferences. An attractive licence price or user interface cannot compensate for an unresolved mandatory information boundary. Request a comparable demonstration using restricted sample data, including a denied action. Document the exact supplier configuration and any features that remain on a roadmap rather than in the tested product. For this service, document inventoried algorithms, certificate ownership and verified interoperability and require a named owner for every unmet mandatory condition. Before leaving the chapter 3 — supplier questionnaire (days 26–40) stage, confirm who can repeat the test and how the next team will obtain the evidence.

Chapter 4 — Prioritise and test (days 41–52)

Score each dependency for long-lived sensitive data, external exposure, system criticality, upgrade constraints and supplier readiness. Choose a controlled test involving a limited service and representative client. Record handshake behaviour, latency, errors, certificate handling, monitoring and recovery. The purpose is to learn which dependencies are real—not to show an impressive laboratory demo.

Do not modify production encryption merely to tick a compliance box. Use change-control criteria and obtain approval from the owners of affected business processes.

Putting cutover and fallback into practice

An exception is valuable evidence when it reveals exactly which decision needs attention. Use unowned cryptographic dependencies and failed interoperability tests as an operating measure but show the observation period and the number of records reviewed. This keeps a small demonstration from becoming a claim about the entire service. Keep algorithm inventory, certificate chain, vendor dependency and test result with the result. Record what the operator expected, what actually happened, who reviewed the difference and which correction followed. The record should be understandable to the security architect, PKI owner and application maintainer, who can agree a pass, a revision or a pause based on observed outcomes. The outcome for the chapter 4 — prioritise and test (days 41–52) stage is a dated record of the accepted business state and any remaining exception.

Recovery is meaningful only when the business process that depends on PKI, network protocols and application libraries can finish. After restoring the platform, ask a business owner to complete the original task and verify dependent records. Retain the outstanding exception list until it has been reconciled. Time the interruption from the first affected user transaction to a verified corrected result. Include identity services, data dependencies and the work required to reconcile actions taken during the outage. If the test fails, revert to the approved interoperable configuration and isolate unsupported clients. Reopen the service only after the affected business owner confirms a valid final state. The outcome for the chapter 4 — prioritise and test (days 41–52) stage is a dated record of the accepted business state and any remaining exception.

Chapter 5 — Final decision pack (days 53–60)

Publish the inventory, confidence gaps, vendor replies and a prioritised 90-day plan. Identify low-regret steps such as retiring obsolete systems, updating supported libraries and improving key inventories. Define procurement requirements for future contracts and a review cadence for vendor roadmap changes.

A successful outcome is a funded, owned transition path with explicit uncertainties. It is not an assertion that the organisation is already protected from all future quantum threats.

Working exercise: supplier response scoring

Use a one-page matrix with columns for service, supplier, present algorithm, proposed standard, evidence link, release status, client impact, rollback and decision. Score evidence as verified in test, documented by vendor, planned or unknown. Any critical service marked unknown should have an owner and a dated next action.

Decision record to complete after day 60

End the programme with three lists: verified dependencies ready for controlled testing, dependencies that need written supplier commitments, and systems requiring architectural replacement. For each item include the business owner, affected customers, probable disruption window, data retention need and cost assumptions. The board-facing summary should distinguish future cryptographic risk from current unsupported software or weak key custody; the latter may deserve urgent attention regardless of quantum progress.

Schedule a review after the next major vendor release. The register should evolve as products change, and investment should concentrate on migration paths that can be demonstrated to work.

Putting the operating handover into practice

The final decision at the operating handover should compare the tested outcome with the original objectives and costs. Consider the alternative of staged cryptographic agility rather than an unsupported immediate cutover if the proposed solution still depends on an untested control. A recommendation needs to distinguish what has been demonstrated from assumptions about future product releases, supplier services or staff capacity.

A procurement decision needs evidence that the service can be operated and exited. Request a comparable demonstration using restricted sample data, including a denied action. Document the exact supplier configuration and any features that remain on a roadmap rather than in the tested product. Separate non-negotiable controls from weighted preferences. An attractive licence price or user interface cannot compensate for an unresolved mandatory information boundary. For this service, document inventoried algorithms, certificate ownership and verified interoperability and require a named owner for every unmet mandatory condition. The outcome for the chapter 5 — final decision pack (days 53–60) stage is a dated record of the accepted business state and any remaining exception.

Request written answers with dates. Put unsupported or unconfirmed dependencies into the risk register rather than accepting broad “quantum-safe” labels.

Practical implementation checklist

  • Appoint the programme owner and name five critical business services
  • Record certificates, VPNs, signing, key storage and software dependencies
  • Classify information by sensitivity and confidentiality lifespan
  • Record unknown algorithms and owners rather than assuming compliance
  • Ask vendors for standards, product versions and availability dates
  • Test at least one dependent connection in a controlled lab
  • Rank migration priorities by sensitivity and service criticality
  • Approve a 90-day follow-up plan and owner

Sources and further reading

INSIGHTS / Practical checklist

Practical checklist

  • Appoint the programme owner and name five critical business services
  • Record certificates, VPNs, signing, key storage and software dependencies
  • Classify information by sensitivity and confidentiality lifespan
  • Record unknown algorithms and owners rather than assuming compliance
  • Ask vendors for standards, product versions and availability dates
  • Test at least one dependent connection in a controlled lab
  • Rank migration priorities by sensitivity and service criticality
  • Approve a 90-day follow-up plan and owner
INSIGHTS / Key takeaways

Key takeaways

01

Chapter 1 — Establish scope and accountable owners (days 1–10)

Choose a sponsor from technology leadership and a service owner for every in-scope platform. Start with five critical journeys, such as remote access, client portal, finance integration, software signing and supplier file exchange. Capture their business impact and confidentiality requirements. Agree that this is a discovery project, not a promise

02

Chapter 2 — Inventory and dependency mapping (days 11–25)

Survey public-facing services, internal PKI, VPNs, email, backups, databases and embedded systems. Log service name, owner, certificate or key mechanism, algorithms when observable, data class, vendor, expiry and anticipated retirement. Map inbound clients as well as servers. A protocol upgrade that disconnects a scanner, industry application or br

03

Chapter 3 — Supplier questionnaire (days 26–40)

Send a consistent set of questions: Which post-quantum standard is supported, if any? Is the feature released, in preview or planned? Which versions and regions are covered? Which client libraries, firmware and certificate authorities need changing? What interoperability tests exist? Who owns the keys? What monitoring and rollback do you provide? W

04

Chapter 4 — Prioritise and test (days 41–52)

Score each dependency for long-lived sensitive data, external exposure, system criticality, upgrade constraints and supplier readiness. Choose a controlled test involving a limited service and representative client. Record handshake behaviour, latency, errors, certificate handling, monitoring and recovery. The purpose is to learn which dependencies

05

Chapter 5 — Final decision pack (days 53–60)

Publish the inventory, confidence gaps, vendor replies and a prioritised 90-day plan. Identify low-regret steps such as retiring obsolete systems, updating supported libraries and improving key inventories. Define procurement requirements for future contracts and a review cadence for vendor roadmap changes. A successful outcome is a funded, owned t

LET'S TALK

Good technology starts with a conversation.

Tell us what you're aiming to achieve. We can discuss your current environment, technology challenges and the right next step.

Start a conversation

Share a few details so we can understand your enquiry.

Form powered by HubSpot. Review our Privacy Policy. If the form doesn’t load, email [email protected].